SR-25 / Okeechobee Road Reconstruction

SCOPE OF WORK

The reconstruction of Okeechobee Road is a massive undertaking. Not only will the intersection of Okeechobee Road and N.W. 116th Way be grade-separated, the project will also include milling and resurfacing of N.W. 116th Way, realignment, and widening of Frontage Road, reconstruction of N.W. South River Drive, construction of 4 new bridges, and widening of 2 existing bridges over the C-6 Canal.

 

As the Engineer of Record, A&P Engineers is responsible for the design and contract documentation of 3 single-span skewed steel plate girder bridges and 1 double-span pre-stressed bridge using Florida I beams. Aside from these structures, our responsibilities extend to the design MSE Walls, signal support systems, and sign support structures.

CLIENT

Florida Department of Transportation District VI

LOCATION

Miami, Florida.

GALLERY
New Karmil Logo 2 Gray.png

KARMIL Construction, Inc.

8935 NW 35th Lane, Suite 205 Doral, FL 33172

Office: (305) 697-9740 

© 2022 KARMIL Construction, Inc. All Rights Reserved

bottom of page