Palmetto Traction Power Sub-Station

SCOPE OF WORK

A&P Engineers answered the call when Miami-Dade Transit (MDT) was in need of a new Traction Power Substation to enhance current Metrorail operations performance and to support new Metrorail vehicles. The proposed substation will be located on MDT property adjacent to the Palmetto Metrorail Station and will support all traction power requirements between the Palmetto and Okeechobee Station. In order to accomplish this, 2 new 13.2 kV feeders will be provided by Florida Power and Light (FPL). These feeders will power the new substation and provide redundant 480V AC power to the Palmetto Metrorail Station which will replace the existing FP&L 25kV system.

CLIENT

Miami-Dade Transit (MDT).

LOCATION

7701 NW 79th Avenue, Miami, Florida